It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.
Critical power backup equipment like UPS System and generator which especially located in harsh, dusty or corrosive environment will fail without proper preventative maintenance. JUNXY provides a whole range of custom preventative maintenance products solutions for UPS systems and generators and many more to ensure constant uptime for your power systems and make you prepared for anything.
Load banks help highlight a large range of faults on the equipment it tests. The first objective when testing with an electric bank is to ensure your equipment’s power supply is reliable. The underlying question that needs answering is whether your equipment will have sufficient power supply to ensure uninterrupted operational performance. The load bank also tests that the equipment is not faulty, that there are no faults in construction, that the aging of the equipment is in line with expectations, that the components are reliable and that there are no pending breakdowns or early signs of wear and tear. The load bank also ensures that the product delivers power conform to its specification.
Resistive & reactive load banks are able mimic motor loads and electromagnetic devices within a power system as well as purely resistive loads by offering the ability to set a specific power factor (pf). Many backup generators and turbines are rated at 0.7, 0.8 or 0.85 power factor and need to be commissioned at nameplate capacity using a combination of resistive and reactive load to fully qualify their operating capability. Using a resistive & reactive load bank enables comprehensive testing from a single unit. JUNXY has an extensive range of resistive & reactive load banks to simulate these types of loads on a power source and the transformers, relays, and switches which will distribute the power throughout your facility.
Inductive & capacitive load banks are reactive only and must be used in combination with a resistive load bank to provide the desired load profile to test a power system. Reactive loads banks can provide either a leading power factor (Capacitive) or lagging power factor (Inductive).
JUNXY series AC load bank testing offers you whole solutions of predictive failure analysis for UPS(uninterrupted power supply), generator, transformers, PV system, inverter etc, to validate the condition and output of such power systems comprehensively, which includes (click to view more):
Technical Specifications | |
---|---|
Model | JUNXY-AC380V-51KW-RLC AC Load Bank |
Load Element | Resistor, inductor and capacitor |
Load Voltage | AC380V 3P4W & AC230V 1P2W |
Rated Frequency | Resistors: 50/60Hz Inductors: 50Hz Capacitors: 50Hz |
3 Phase Load Power | R=51KW(17KW per phase) @AC380V 3P4W L=51KVar(17KVar per phase) @AC380V 3P4W C=51KVar(17KVar per phase) @AC380V 3P4W |
Load Steps Per Phase @AC220V 1P2W, 50Hz | Resistive load steps per phase: 100W-17KW adjustable Resistive load steps for phase A/B/C(KW): 100W, 200W*2, 500W, 1KW, 2KW, 3KW, 5KW*2 Inductive load steps per phase: 100Var-17KVar adjustable Inductive load steps for phase A/B/C(KVar): 100Var, 200Var*2, 500Var, 1KVar, 2KVar, 3KVar, 5KVar*2 Capacitive load steps per phase: 100Var-17KVar adjustable Capacitive load steps for phase A/B/C(KVar): 100Var, 200Var*2, 500Var, 1KVar, 2KVar, 3KVar, 5KVar*2 |
Power Factor | Leading and lagging power factor 0-1.0 adjustable |
Load Accuracy | Resistor/capacitor: ±5%, Inductor: ±10% |
Digital Meter | voltage, current, active power, reactive power, apparent power, power factor, energy, frequency |
Mains Voltage | AC220V 1phase 2wire, 50Hz |
Control Modes | 1. Local control panel 2. PC remote control |
Load Input Wire Connections | Copper bus bar for wire connections |
Insulation Class | F |
Protection Level | IP54(outdoor usage) |
Fan Noise | 75dB |
Cooling Mode | Force-air horizontal cooling, by axial-flow fans. |
Work Mode | Continuous work |
Protections | Over voltage/current/temperature alarming and load automatically removed, emergency stop button |
Pls click
HERE
to view the video of PC software remote control
Pls click
HERE
to view the video of local panel control