Power factor 0.8 adjustable Resistive & Inductive combined AC Load Bank(RL)

Power factor 0.8 adjustable Resistive & Inductive combined AC Load Bank(RL)



Why need resistive reactive load bank testing?


It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter, etc working in good condition if switched to be loaded when the main power supply is in maintenance procedure or stops abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.

 

Critical power backup equipment like UPS System and generator which are especially located in harsh, dusty, or corrosive environments will fail without proper preventative maintenance. JUNXY provides a whole range of custom preventative maintenance products solutions for UPS systems and generators and many more to ensure constant uptime for your power systems and make you prepared for anything.

 

Load banks help highlight a large range of faults on the equipment it tests. The first objective when testing with an electric bank is to ensure your equipment’s power supply is reliable. The underlying question that needs answering is whether your equipment will have a sufficient power supply to ensure uninterrupted operational performance. The resistive reactive load bank also tests that the equipment is not faulty, that there are no faults in construction, that the aging of the equipment is in line with expectations, that the components are reliable, and that there are no pending breakdowns or early signs of wear and tear. The load bank also ensures that the product delivers power conform to its specification.

 

Resistive & reactive load banks are able to mimic motor loads and electromagnetic devices within a power system as well as purely resistive loads by offering the ability to set a specific power factor (pf). Many backup generators and turbines are rated at 0.7, 0.8 or 0.85 power factor and need to be commissioned at nameplate capacity using a combination of resistive and reactive load to fully qualify their operating capability. Using a resistive & reactive load bank enables comprehensive testing from a single unit. JUNXY has an extensive range of resistive & reactive load banks to simulate these types of loads on a power source and the transformers, relays, and switches which will distribute the power throughout your facility. 

 

Inductive & capacitive load banks are reactive only and must be used in combination with a resistive load bank to provide the desired load profile to test a power system. Reactive loads banks can provide either a leading power factor (Capacitive) or lagging power factor (Inductive).

 

JUNXY series load bank testing offers you whole solutions of predictive failure analysis for UPS(uninterrupted power supply), generator, transformers, PV system, inverter etc, to validate the condition and output of such power systems comprehensively, which includes (click to view more):

RCD AC load bank(RCD)

Resistive and inductive AC load bank(RL)

Resistive, inductive and capacitive AC load bank(RLC) 


scheduled load bank maintenance procedures, regular load bank maintenance testing and validating specifications for generator, there could be risk-free, take precautions to nip. JUNXY provides a series of intelligent generator load bank test power solutions, which can accurately detect the output power and load capacity.

To help users achieve various types of generator maintenance testing:

· accurately detecting a long time diesel generator output power and load capacity.

· the new generator project acceptance, its output can meet the contract requirements.

· Installing muffler, generator room, after entering the exhaust noise reduction measures, its output is affected. Back pressure, and exhaust air power correction factors such as inadequate.

· intelligent communication load can be distributed load, you can load/unload of 100% detection, detect the running test of generator sets in a variety of work environments.

· generator, after overhaul, testing its power output, load capacity, and performance indicators to meet the requirements.

· generator maintenance routine testing, issued under the new code requirements for the backup power supply maintenance, test machine 30-60 minutes to load diesel generators annually.

 

Generator ac load bank testing process and testing purposes

The power test service will reach the following target:

· Generators can achieve the rated power

· Preventative load bank test could avoid the generator wet stacking free away from rated capacity reduction

· The generator steady-state loading ability

· The generator transient state loading ability

· Generator setting test by PC software

· Generator fluctuation test by PC software

· Load profiles generator load bank test

· Unbalanced three-phase operation of generator capacity;

· Generator set overload compliance (optional);

· Generator set targets to reach the required specifications

· To detect generator security risks before they occur.

Pls click HERE to download JUNXY ENERGY load bank catalogue for more details, OR could email SALES@JUNXYENERGY.COM for more consultance.

Show:
Sort By:

JUNXY AC250V 120A ATS load current simulation ATE

The JUNXY contactor & relay test ATE(AUTO TEST EQUIPMENT) is used for contactor, relay and many AC switch electrical lifespan test, current switching capability test.The ac relay/contactors on/off will cause 2 kind of wear to the main contacts: mechanical & electr..

More

$0.00

JUNXY AC300V 150A ATS load current simulation RL load bank

Why load bank testing is important?JUNXY series AC/DC load banks are for many power supplies load bank testing, to ensure that the standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located in..

More

$0.00

JUNXY AC300V 40A ATS load current simulation RL load bank

Why load bank testing is important?JUNXY series AC/DC load banks are for many power supplies load bank testing, to ensure that the standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located in..

More

$0.00

JUNXY AC400V 2500KW generator test by programmable resistive load bank

Why load bank testing is important?JUNXY series AC/DC load banks are for many power supplies load bank testing, to ensure that the standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located in..

More

$0.00

JUNXY Series Resistive & Inductive AC Load Banks

JUNXY resistive & inductive AC load banks are used to simulate the motor loads or other electromagnetic devices working at their rated power factor. Many backup generators and turbines are rated at 0.7, 0.8 or 0.85 power factor and need..

More

$0.00

JUNXY-AC346V-50KVA-RL Resistive, Inductive AC Load Bank

Why load bank testing is important?JUNXY series AC/DC load banks are for many power supplies load bank testing, to ensure that the standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located..

More

$0.00

JUNXY-AC380V-500KW-RL Resistive, Inductive AC Load Bank

Why need load bank testingIt is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or s..

More

$0.00

JUNXY-AC380V-60KW-RL Resistive, Inductive AC Load Bank

Why need load bank testingIt is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or s..

More

$0.00

JUNXY-AC400V-200KW-RL Resistive, Inductive & Reactive AC Load Bank

Why load bank testing is important?JUNXY series AC/DC load banks are for many power supplies load bank testing, to ensure that the standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located..

More

$0.00

JUNXY-AC400V-41KW-RL Resistive, Inductive AC Load Bank

Why need load bank testingIt is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or s..

More

$0.00

JUNXY-AC400V-50KW-RL Resistive, Inductive AC Load Bank

Why need load bank testingIt is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or s..

More

$0.00

JUNXY-AC600V-105KVA-RL Resistive, Inductive AC Load Bank

Why load bank testing is important?JUNXY series AC/DC load banks are for many power supplies load bank testing, to ensure that the standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located..

More

$0.00

JUNXY-AC600V-180KVA-RL Resistive, Inductive AC Load Bank

JUNXY — это серия аппаратов электро-нагрузки постоянного и переменного напряжения, идеально подходящая для многих задач, где требуются приборы нагрузки для тестирования модулей электропитания в системах, обеспечивающих бесперебойное питание — аккумуляторных блоках, генератор..

More

$0.00