It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.
Critical power backup equipment like UPS System and generator which especially located in harsh, dusty or corrosive environment will fail without proper preventative maintenance. JUNXY provides a whole range of custom preventative maintenance products solutions for UPS systems and generators and many more to ensure constant uptime for your power systems and make you prepared for anything.
Load banks help highlight a large range of faults on the equipment it tests. The first objective when testing with an electric bank is to ensure your equipment’s power supply is reliable. The underlying question that needs answering is whether your equipment will have sufficient power supply to ensure uninterrupted operational performance. The load bank also tests that the equipment is not faulty, that there are no faults in construction, that the aging of the equipment is in line with expectations, that the components are reliable and that there are no pending breakdowns or early signs of wear and tear. The load bank also ensures that the product delivers power conform to its specification.
Resistive & reactive load banks are able mimic motor loads and electromagnetic devices within a power system as well as purely resistive loads by offering the ability to set a specific power factor (pf). Many backup generators and turbines are rated at 0.7, 0.8 or 0.85 power factor and need to be commissioned at nameplate capacity using a combination of resistive and reactive load to fully qualify their operating capability. Using a resistive & reactive load bank enables comprehensive testing from a single unit. JUNXY has an extensive range of resistive & reactive load banks to simulate these types of loads on a power source and the transformers, relays, and switches which will distribute the power throughout your facility.
Inductive & capacitive load banks are reactive only and must be used in combination with a resistive load bank to provide the desired load profile to test a power system. Reactive loads banks can provide either a leading power factor (Capacitive) or lagging power factor (Inductive).
JUNXY series AC load bank testing offers you whole solutions of predictive failure analysis for UPS(uninterrupted power supply), generator, transformers, PV system, inverter etc, to validate the condition and output of such power systems comprehensively, which includes (click to view more):
Technical Specifications | |
---|---|
Model | JUNXY-AC400V-50KW-RL Resistive & Inductive AC Load Bank |
Load Element | Alloy resistors & Inductors |
Load Voltage | AC400V 3phase 4wire, 50Hz |
Load Power | Resistive: 50KW for AC400V 3phase 4wire, 50Hz Inductive: 37.5KVar for AC400V 3phase 4wire, 50Hz |
Load Steps @AC400V 3P4W | Resistive Load Steps (three phase controlled): 1KW, 2KW, 2KW, 5KW, 10KW*2, 20KW (1KW-50KW adjustable) Inductive Load Steps (three phase controlled): 0.5KVar, 1KVar, 2KVar, 2KVar, 5KVar, 7KVar, 10KVar, 10KVar (0.5KVar-37.5KVar adjustable) |
Power Factor | PF=0.8 and adjustable by client |
Load Accuracy | Resistive: ±5%, Inductive: ±10% |
Digital Meter | Voltage, Current, Power, Frequency, Power Factor and etc. |
Power Supply | 220V 50Hz, single phase |
Control Mode | 1. Manual control by push button 2. Remote control by PC software |
Wire Connections | Copper bus bar for wire connections |
Insulation Class | F |
Protection Level | IP20(indoor use) |
Fan Noise | 75dB |
Cooling Mode | Force-air cooling |
Work Mode | Continuous work |
Protections | Overheating/buzzer alarm, overheating/over voltage protection, emergency stop button |
Ambient Temperature | -10℃~+50℃ |
Dimension | 650*1000*1650mm |
Weight | 250KG |
Mobility | Four wheels |
Humidity | ≤95% |
Altitude | ≤2500 meters |