It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance. Critical power backup equipment like UPS System and generator which especially located in harsh, dusty or corrosive environment will fail without proper preventative maintenance. So validating the condition and output of such power systems must be conducted comprehensively. JUNXY provides a whole range of custom preventative maintenance products solutions for UPS systems and generators and many more to ensure constant uptime for your power systems and make you prepared for anything.
Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an inefficient facility and higher than expected operational costs. By simply identifying where equipment manufacturers’ standard specifications are not appropriate for the IT load, the supporting infrastructure, in particular the cooling plant, can be configured to meet the requirements of the facility and lead to much higher levels of efficiency. Data centre commissioning can lead to significant energy savings when implemented correctly by a specialist commissioning team. By engaging JUNXY power solutions to ensure that systems are running correctly, clients have saved up to 67% on facility operational costs.
The Junxy rack mounted AC & DC load banks are designed especially for internet data center (IDC) test and commissioning. Load bank integrated system test (IST) could precisely simulate the data center’s electricity consumption, heat dissipation, air flow, hot & cold aisle testing, thus to ensure the effective operation of power supply & distribution system (generator, UPS, EPS included), air conditioning system, lightning protection and earthing system, monitoring system, data center integrated environments, cabinet IT environment, providing independent verification of integrated system testing. Successful IST(integrated system test) should have installation of server load banks in data center and server room etc, Junxy provides resistive, reactive and capacitive load banks in low or medium voltage to cover the entire scope of your commission and testing requirements.
Applications:
Technical Specifications | |
---|---|
Model | JUNXY-AC230V-6.6KW-R Resistive AC Load Bank |
Load Element | Stainless steel resistor |
Load Voltage | AC230V single phase, 50/60Hz |
Rated Power | 6.6KW@AC230V |
Load Steps | 3 independent load channels: AC1, AC2, AC3 AC1 Load Channel (Fan power supply also): 2*1.1KW AC2 Load Channel: 2*1.1KW AC3 Load Channel: 2*1.1KW Total 6 load steps: 1.1KW*6 |
Power Factor | PF=1 |
Load Accuracy | ±5% |
Power Supply | Fan activated by AC1 cable: 230V 1phase 50Hz from test source |
Control Mode | Manual control by mini circuit breaker |
Insulation Class | F |
Protection Level | IP20(indoor use) |
Fan Noise | 75dB |
Cooling Mode | Fan force-air cooling, powered from the test source. Cool air intake at front, hot air exhaust at rear. Fan activated by AC1 cable: 230V 1phase 50Hz from test source |
Work Mode | Continuous work |
Ambient Temperature | -10℃~+50℃ |
Load Input Cables | Three C19-C20 cables(Or other as per requested) |
Dimension | 4U 19 inch rack, depth 600mm |
Weight | 19KG |
Mobility | Two front handles and one rear handle |
Humidity | ≤95% |
Altitude | ≤2500 meters |
IMPORTANT: please read the designed diagram and manual before any operation.
Please DO NOT REMOVE AC1 cable during loading to ensure cooling available.
Loading Wiring Preparation
Load Bank Loading Operation
IMPORTANT NOTE: DO NOT remove AC1 cable during loading
Load Bank Disloading Operation