DATA CENTER SERVER HEAT LOAD BANK SIMULATION

DATA CENTER SERVER HEAT LOAD BANK SIMULATION

 

When building a new data center, the owner of the data center has no guarantee that the various physical infrastructure subsystems – power, cooling, fire suppression, security, and management – will work together. Commissioning is the process that reviews and tests the data center’s physical infrastructure design as a holistic system in order to assure the highest level of reliability.   

Traditional commissioning is a daunting task. Since formal system operation doesn’t begin until the system is commissioned, the commissioning team experiences intense pressure to complete the commissioning process quickly. Commissioning can involve high expense and requires staffs from different departmental disciplines to work together. For these reasons data center commissioning has almost uniquely been associated with large data centers (over 20,000 ft2 or 1,858 m2). In the recent past, many data center managers chose to roll the dice and perform little or no commissioning, relying only on start-up data to press ahead with launching the new data center. Given the reality of 24x7 operations, however, the alternative of exposure to major system failures and accompanying downtime is no longer an economically viable option. Commissioning has now become a business necessity. JUNXY series AC & DC rack mounted load banks heat simulator can be used to introduce heat loads and to allow for simultaneous testing of both electrical and cooling systems. 

It is the ideal way to use Load bank testing for the data center heat simulation, load bank heat simulation allows you to confirm the performance of the cooling and power distribution infrastructures. JUNXY load bank heat simulation test also validates room design and equipment placement. JUNXY data center load bank heat simulation testing should test the entire system as integrated, not simply individual components: it include the UPS load bank test, generator load bank test, PDU(power distribution unit) load bank test, server heat simulation load bank test, HVAC system load bank test for data center heat simulation test

The JUNXY AC230V 6.6KW dual feeds/power rack load bank is a safe and simple way to provide rack level load bank testing.

The load bank is only by small 4U footprint and can test up to a maximum of 6.6KW of load, controlled via six 1.1KW individually controlled load segments by the mini circuit breaker.

The load bank is auto transfer in between the 2 feeds/power, with lights indicator power on for each feed/power. Each feed with 3 independent load channel by three C20 input sockets.

The load bank is light weight and portable with 2 front handles & 1 rear handle. Connection to the load bank is made effortlessly via six C20 input sockets, mounted conveniently on the front of the unit. Cool air intake at front, hot air exhaust at rear. Over heat protection with load removed automatically.

Pls click here to view the video for the data center commissioning loading test by JUNXY 230V 6.6KW data center server simulator load bank. 

Show:
Sort By:

AC220V/380V 10KW Dual Feed Auto Transfer Data Center Server Simulator Load Bank

JUNXY Rack Mounted Load Bank Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an ineffici..

More

$0.00

AC230V 6.6KW Dual Feed Auto Transfer Data Center Server Simulator Load Bank

JUNXY Rack Mounted Load Bank Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an ineffici..

More

$0.00

AC230V 6.6KW Dual Feed Data Center Server Simulator Load Bank

JUNXY Rack Mounted Load Bank Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an ineffici..

More

$0.00

AC230V/400V 6.66KW 4U Rack Mounted AC Load Bank For Data Center Server Heat Simulation

JUNXY Rack Mounted Load BankFollowing on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an inefficient ..

More

$0.00

Dual Feed AC230V 6.6KW Rack Type Load Bank For Data Center Server Simulation

JUNXY Rack Mounted Load Bank:  Pls click here to view the video for the data center commissioning loading test by JUNXY 230V 6.6KW data center server simulator load bank. Following on from construction and testing, Data Centre Commissioning is e..

More

$0.00

Dual Feed AC400V 22KW Rack Type Load Bank For Data Center Server Simulation

JUNXY Rack Mounted Load BankFollowing on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an inefficient faci..

More

$0.00

JUNXY 230V 3KW Immersion Cooling Load Banks Server Emulator

Data center immersion cooling is a technique that helps improve thermal design by directly immersing IT hardware in a non-conductive liquid. The heat generated by the electronic components is directly and efficiently transferred to the fluid, thereby reducing otherwise n..

More

$0.00

JUNXY 230V 6KW 6U Intelligent Load Banks For Data Center Heat Load Test

It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downti..

More

$0.00

JUNXY 240V 6KW 6U Rack Mounted Load Banks For Data Center Heat Load Test

It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downti..

More

$0.00

JUNXY 400V 12KW 8U load bank for immersion cooling

Data center immersion cooling is a technique that helps improve thermal design by directly immersing IT hardware in a non-conductive liquid. The heat generated by the electronic components is directly and efficiently transferred to the fluid, thereby reducing otherwise n..

More

$0.00

JUNXY AC230V 6.6KW 4U Rack Mounted Load Banks For Data Center Server Heat Load Simulation

It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downti..

More

$0.00

JUNXY AC415V 80KW Rack Mounted AC Load Bank

Why need load bank testing It is really critical to ensure that your standby power supply system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc which especially located in harsh, dusty or corrosive environment working in good c..

More

$0.00

JUNXY Rack Mounted Load Banks

Why need load bank testingIt is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or s..

More

$0.00