AC220V/380V 10KW Dual Feed Auto Transfer Data Center Server Simulator Load Bank

×

JUNXY Rack Mounted Load Bank

Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an inefficient facility and higher than expected operational costs. By simply identifying where equipment manufacturers’ standard specifications are not appropriate for the IT load, the supporting infrastructure, in particular the cooling plant, can be configured to meet the requirements of the facility and lead to much higher levels of efficiency. Data centre commissioning can lead to significant energy savings when implemented correctly by a specialist commissioning team. By engaging JUNXY power solutions to ensure that systems are running correctly, clients have saved up to 67% on facility operational costs.

The Junxy rack mounted AC & DC load banks are designed especially for internet data center (IDC) test and commissioning. Load bank integrated system test (IST) could precisely simulate the data center’s electricity consumption, heat dissipation, air flow, hot & cold aisle testing, thus to ensure the effective operation of power supply & distribution system (generator, UPS, EPS included), air conditioning system, lightning protection and earthing system, monitoring system, data center integrated environments, cabinet IT environment, providing independent verification of integrated system testing. Successful IST(integrated system test) should have installation of server load banks in data center and server room etc, Junxy provides resistive, reactive and capacitive load banks in low or medium voltage to cover the entire scope of your commission and testing requirements.

Applications

Data center & server room cooling system test

Data center air flow, hot/cold aisle environment inspection

Validating the tire level of data center

Validating the reliability of data center power supply & distribution system

Testing the main network before connecting user devices (servers, switches, etc.)

The JUNXY AC230V 6.6KW dual feeds/power rack load bank is a safe and simple way to provide rack level load bank testing. The load bank is only by small 4U footprint and can test up to a maximum of 6.6KW of load, controlled via six 1.1KW individually controlled load segments by the mini circuit breaker. The load bank is auto transfer in between the 2 feeds/power, with lights indicator power on for each feed/power. Each feed with 3 independent load channel by three C20 input sockets. The load bank is light weight and portable with 2 front handles & 1 rear handle. Connection to the load bank is made effortlessly via six C20 input sockets, mounted conveniently on the front of the unit. Cool air intake at front, hot air exhaust at rear. Over heat protection with load removed automatically.

AC380VAC220V-10KW-DUAL-FEEDS-LB-scaled.jpg
Technical Specifications
ModelJUNXY-AC220/380V-10KW-R Resistive AC Load Bank
Load ElementStainless steel resistor
Load Voltage

AC220V 1P2W, 50/60Hz

AC380V 3P4W, 50/60Hz
Rated Power10KW@AC220V 1P2W,

10KW@AC380V 3P4W
Feeds QuantityDual feeds, interlock
Load Steps3 independent load channels per feed: 3.3KW*3
Power FactorPF=1
Load Accuracy±5%
Power SupplyFrom test source
Control ModeManual control by mini circuit breaker
Insulation ClassF
Protection LevelIP20(indoor use)
Fan Noise75dB
Cooling ModeFan force-air cooling, powered from the test source.

Cool air intake at front, hot air exhaust at rear.
Work ModeContinuous work
Ambient Temperature-10℃~+50℃
Load InputBy terminals
Dimension6U 19 inch rack, depth 600mm
Weight30KG
MobilityTwo front handles and one rear handle
Humidity≤95%
Altitude≤2500 meters