Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an inefficient facility and higher than expected operational costs. By simply identifying where equipment manufacturers’ standard specifications are not appropriate for the IT load, the supporting infrastructure, in particular the cooling plant, can be configured to meet the requirements of the facility and lead to much higher levels of efficiency. Data centre commissioning can lead to significant energy savings when implemented correctly by a specialist commissioning team. By engaging JUNXY power solutions to ensure that systems are running correctly, clients have saved up to 67% on facility operational costs.
The Junxy rack mounted AC & DC load banks are designed especially for internet data center (IDC) test and commissioning. Load bank integrated system test (IST) could precisely simulate the data center’s electricity consumption, heat dissipation, air flow, hot & cold aisle testing, thus to ensure the effective operation of power supply & distribution system (generator, UPS, EPS included), air conditioning system, lightning protection and earthing system, monitoring system, data center integrated environments, cabinet IT environment, providing independent verification of integrated system testing. Successful IST(integrated system test) should have installation of server load banks in data center and server room etc, Junxy provides resistive, reactive and capacitive load banks in low or medium voltage to cover the entire scope of your commission and testing requirements.
ApplicationsData center & server room cooling system test
Data center air flow, hot/cold aisle environment inspection
Validating the tire level of data center
Validating the reliability of data center power supply & distribution system
Testing the main network before connecting user devices (servers, switches, etc.)
The JUNXY AC230V 6.6KW dual feeds/power rack load bank is a safe and simple way to provide rack level load bank testing. The load bank is only by small 4U footprint and can test up to a maximum of 6.6KW of load, controlled via six 1.1KW individually controlled load segments by the mini circuit breaker. The load bank is auto transfer in between the 2 feeds/power, with lights indicator power on for each feed/power. Each feed with 3 independent load channel by three C20 input sockets. The load bank is light weight and portable with 2 front handles & 1 rear handle. Connection to the load bank is made effortlessly via six C20 input sockets, mounted conveniently on the front of the unit. Cool air intake at front, hot air exhaust at rear. Over heat protection with load removed automatically.
Technical Specifications | |
---|---|
Model | JUNXY-AC220/380V-10KW-R Resistive AC Load Bank |
Load Element | Stainless steel resistor |
Load Voltage | AC220V 1P2W, 50/60Hz AC380V 3P4W, 50/60Hz |
Rated Power | 10KW@AC220V 1P2W, 10KW@AC380V 3P4W |
Feeds Quantity | Dual feeds, interlock |
Load Steps | 3 independent load channels per feed: 3.3KW*3 |
Power Factor | PF=1 |
Load Accuracy | ±5% |
Power Supply | From test source |
Control Mode | Manual control by mini circuit breaker |
Insulation Class | F |
Protection Level | IP20(indoor use) |
Fan Noise | 75dB |
Cooling Mode | Fan force-air cooling, powered from the test source. Cool air intake at front, hot air exhaust at rear. |
Work Mode | Continuous work |
Ambient Temperature | -10℃~+50℃ |
Load Input | By terminals |
Dimension | 6U 19 inch rack, depth 600mm |
Weight | 30KG |
Mobility | Two front handles and one rear handle |
Humidity | ≤95% |
Altitude | ≤2500 meters |